ConTech,
site-ready.
Site-management apps, BIM integrations, defect logs, snagging tools, safety and compliance — built for muddy hands and intermittent 4G as much as for the boardroom dashboard.
Construction software
we ship.
Site-management apps, BIM integrations, defect logs, snagging tools, safety and compliance — built for muddy hands and intermittent 4G as much as for the boardroom dashboard.
Site management apps
Tasks, RFIs, daily reports — offline-first iOS / Android for site teams in places without reliable 4G.
BIM integrations
IFC, Revit, Navisworks — feeds and viewers that don't crash the iPad halfway through a tower.
Defects & snagging
Photo capture, voice notes, GPS pins, status workflow — the snag list the site manager will actually use.
Safety & compliance
Permit-to-work, toolbox talks, incident reports — ISO 45001 / CDM-aware, audit-ready.
Procurement & supply
Materials ordering, just-in-time delivery, supplier portals — connected to ERP, not faxed.
Owner / FM platforms
Asset registers, maintenance schedules, building data dashboards — post-handover, the long tail.
How we build successful
ConTech platforms.
From the start of the journey we ensure transparency. Plan, roadmap, weekly demos. You're in the room at every stage.
Product development consultation
Transparency from day one. We discuss the plan of action and build a precise app deployment roadmap. At each stage of development, we encourage you to participate in discussions.
User-oriented design
A talented team of designers creates an accurate user-journey map — predicting intuitive nature and functionality. User-friendly interfaces built on extensive research.
Agile development
A decade of experience in Web, iOS and Android development. Customised bespoke solutions, delivered in a collaborative environment — your boldest ideas, realised.
A site-ready ConTech app,
in six steps.
Same six-stage process we run on every engagement — adapted to logistics constraints (carrier integrations, regulatory mode, fleet telemetry).
User research
1 – 2 weeksStrategic processes define user roles — driver, dispatcher, warehouse worker, ops manager — and run up to 10 impactful interviews. Insights become a guaranteed roadmap.
Product scope
1 – 2 weeksWe determine feature priority, set timelines, design interactions and define the logistics behind the app. Basic prototype first — adding functionality later.
Design
2 – 3 weeksSoftware architecture schemes, UI mockups, graphic imagery — reflecting your business identity. Interactive prototype for testing and presentation.
Development
10 – 20 weeksAgile development transforms the process into a customer-driven journey. Iterative approach, collaborative mindset, change embraced seamlessly.
Testing
2 – 3 weeksFrom feature-rich development to rigorous staging. Each step a precision move toward a seamless user experience. QA as continuous guardians.
Deployment
1 weekPlanning, version control, testing, cutting-edge strategies like canary releases. Swift, trouble-free installations with continuous monitoring.
Technologies
we work on.
The actual stack on construction engagements — BIM, site apps, defects, drawings and back-office.
- TypeScript
- Python
- C# (.NET BIM)
- Swift · Kotlin (site apps)
- Swift · SwiftUI
- Kotlin · Compose
- React Native
- Flutter
- Autodesk Forge · APS
- IFC.js
- Three.js · Babylon
- Trimble · Navisworks
- WebSockets
- WebRTC site walks
- Push notifications
- SSE
- Node.js · NestJS
- Python · FastAPI
- .NET
- GraphQL · REST
- PostgreSQL · PostGIS
- Redis
- S3 drawing store
- ClickHouse
- OpenAI · Anthropic
- Vision (defect · snag)
- Pricing · take-off
- pgvector · RAG
- Procore · Autodesk CC
- Aconex · Asite
- Stripe · Xero
- Companies House
What clients
say.
Pulled from independently-verified Clutch reviews — 60+ of them, 4.9 average.
Their offline-first iPad app survived the basement of a London office tower. That tells you everything.
BIM-driven defect logging cut snag-list resolution by 35%. The site teams actually use it — that's rare.
CDM-aware safety workflows from week one. The compliance team didn't have a single change request at delivery.
ConTech platforms
we've shipped.
Four from the wider portfolio — operational platforms running today across rail, marine, road and warehouse.
Sizing App
Tablet app for the construction industry — on-site measurements and order capture.
See case study → Infrastructure · MonitoringRailway software
Hardware reliability monitoring — sensor data, asset trees, defect workflows.
See case study → Facility Mgmt · BespokeMaintenance Software
Magora's facility management platform — defect, snagging and asset workflows.
See case study → Hospitality · IoTBarTrack
IoT inventory and quality tracking — owner dashboard on top of sensor data.
See case study →The honest
questions.
Pick a slot below
and let's talk.
No commitment, no charge. We'll review your project, scope the next step, and tell you the realistic price + timeline. Free working prototype + senior PO analysis before any paid engagement.
Construction idea
on the dig?
30-minute call with a senior architect who's shipped fleet, warehouse and tracking platforms before. We'll review your constraints and tell you what we'd actually build if it were us.